It took the entire lab to “raise the barn” in our 600 sq ft lab. As you see here, this steel structure is just the start of the support system for the ABRC Harness project. Thanks to the team effort and solid design (care of Felicity and Dustin), the frame went together in about 3 hours and was easier than prefab furniture!
From let to right: Dustin Branges, Noah Oliver, Felicity Escarzaga, Kristen Shryack, Dr. Kyle Winfree, and Caitlin Barrett.